Verdrag betreffende het voorkomen van zware industriële ongevallen
In respect of each major hazard installation employers shall establish and maintain a documented system of major hazard control which includes provision for:
a) the identification and analysis of hazards and the assessment of risks including consideration of possible interactions between substances;
b) technical measures, including design, safety systems, construction, choice of chemicals, operation, maintenance and systematic inspection of the installation;
c) organizational measures, including training and instruction of personnel, the provision of equipment in order to ensure their safety, staffing levels, hours of work, definition of responsibilities, and controls on outside contractors and temporary workers on the site of the installation;
d) emergency plans and procedures, including: (i) the preparation of effective site emergency plans and procedures, including emergency medical procedures, to be applied in case of major accidents or threat thereof, with periodic testing and evaluation of their effectiveness and revision as necessary;
(ii) the provision of information on potential accidents and site emergency plans to authorities and bodies responsible for the preparation of emergency plans and procedures for the protection of the public and the environment outside the site of the installation;
(iii) any necessary consultation with such authorities and bodies;
(i) the preparation of effective site emergency plans and procedures, including emergency medical procedures, to be applied in case of major accidents or threat thereof, with periodic testing and evaluation of their effectiveness and revision as necessary;
(ii) the provision of information on potential accidents and site emergency plans to authorities and bodies responsible for the preparation of emergency plans and procedures for the protection of the public and the environment outside the site of the installation;
(iii) any necessary consultation with such authorities and bodies;
e) measures to limit the consequences of a major accident;
f) consultation with workers and their representatives;
g) improvement of the system, including measures for gathering information and analysing accidents and near misses. The lessons so learnt shall be discussed with the workers and their representatives and shall be recorded in accordance with national law and practice.
a) the identification and analysis of hazards and the assessment of risks including consideration of possible interactions between substances;
b) technical measures, including design, safety systems, construction, choice of chemicals, operation, maintenance and systematic inspection of the installation;
c) organizational measures, including training and instruction of personnel, the provision of equipment in order to ensure their safety, staffing levels, hours of work, definition of responsibilities, and controls on outside contractors and temporary workers on the site of the installation;
d) emergency plans and procedures, including: (i) the preparation of effective site emergency plans and procedures, including emergency medical procedures, to be applied in case of major accidents or threat thereof, with periodic testing and evaluation of their effectiveness and revision as necessary;
(ii) the provision of information on potential accidents and site emergency plans to authorities and bodies responsible for the preparation of emergency plans and procedures for the protection of the public and the environment outside the site of the installation;
(iii) any necessary consultation with such authorities and bodies;
(i) the preparation of effective site emergency plans and procedures, including emergency medical procedures, to be applied in case of major accidents or threat thereof, with periodic testing and evaluation of their effectiveness and revision as necessary;
(ii) the provision of information on potential accidents and site emergency plans to authorities and bodies responsible for the preparation of emergency plans and procedures for the protection of the public and the environment outside the site of the installation;
(iii) any necessary consultation with such authorities and bodies;
e) measures to limit the consequences of a major accident;
f) consultation with workers and their representatives;
g) improvement of the system, including measures for gathering information and analysing accidents and near misses. The lessons so learnt shall be discussed with the workers and their representatives and shall be recorded in accordance with national law and practice.